PARTY WALLS MADE EASY
  • Home
  • About
    • Reviews
  • SERVICES
    • FREE PARTY WALL NOTICES
    • FREE PARTY WALL ASSESSMENT
    • CONDITION RECORDS
    • PARTY WALL AWARDS
  • FEES
  • FAQs
  • Contact
    • INSTANT QUOTE ONLINE
    • GET A QUOTE
    • APPOINT US ONLINE
    • BOOK SITE VISIT
  • Home
  • About
    • Reviews
  • SERVICES
    • FREE PARTY WALL NOTICES
    • FREE PARTY WALL ASSESSMENT
    • CONDITION RECORDS
    • PARTY WALL AWARDS
  • FEES
  • FAQs
  • Contact
    • INSTANT QUOTE ONLINE
    • GET A QUOTE
    • APPOINT US ONLINE
    • BOOK SITE VISIT

LEARN ABOUT PARTY WALL MATTERS 

the administration of the Party Wall Act can be quite complEX. 
We strive to provide as much information as possible to assist the public when dealing with party wall matters.
PLEASE CONTACT US IF YOU NEED TAILORED ADVICE
.

FREE ADVICE: Call 0207 11 88 070

When To Serve Party Wall Notices

2/6/2025

 
Timing your party wall notices correctly is helpful for avoiding unnecessary delays and unexpected costs.

This overview explains when and how these notices should be served.
Key Information on Party Wall Notices
Types of Work and Notice Periods
  • Excavation work or building a new wall at the boundary – Minimum notice: 1 month
  • Works involving an existing party or adjoining structure – Minimum notice: 2 months

Understanding Notice Periods
​Typically, notice periods don't present major issues, as adjacent owners are often willing to waive them once documents are in place.
However, special circumstances—such as upcoming garden parties or school exams—can make some neighbours more particular about timing.
It’s worth noting that some surveyors delay making an award under the pretext that the notice period hasn’t elapsed. While technically true, this approach runs counter to the Party Wall Act's intent, which encourages proactive and timely progress.

Planning Is Key
Avoid unnecessary project delays by factoring in notice periods during early planning stages.

Best Practices for Serving Party Wall Notices
Start Early—but Not Prematurely
Issue your notice once you're committed to the project but no earlier than 12 months before your planned construction start date.

What to Include with the Notices: Drawings or Descriptions?
The Party Wall Act outlines what information should accompany each type of notice:
  • Section 1 – A clear outline of the proposed wall.
  • Section 3 – Detailed explanation, supported by diagrams and structural data if special foundations are involved.
  • Section 6 – Planning drawings and structural drawings too.

Bottom Line
Highly detailed technical drawings aren’t always mandatory, but clear, consistent plans help tell a complete story. When properly illustrated, your notices can pre-empt questions rather than prompting them.
If neighbours are left uncertain and seek external advice, you risk losing control over how the situation is interpreted.

Tips for Serving Notices Effectively
Start with a Conversation
Before issuing formal notices—or even submitting a planning application—discuss your intentions with neighbours. Explain what you plan to do and how the Party Wall Act applies.

Consider Trial Pits
Digging trial holes to assess soil conditions or foundation depths can be done ahead of serving notice. This can support your design decisions and show your neighbour that your approach is organised and professional.
Note: Trial pits are generally rare for smaller-scale residential works due to practical constraints.

Preparing and Serving the Notice
DIY or Hire a Professional?
Though homeowners are legally allowed to draft and serve their own notices, correctness is crucial for legal compliance. Missing required information can make the notice invalid, potentially undermining trust and delaying progress.

Hiring a knowledgeable party wall surveyor is often the most reliable and economical option, ensuring compliance and helping the process run smoothly.

Conclusion
Understanding when and how to serve party wall notices helps avoid common pitfalls and project delays.
With the right preparation—and help from an experienced surveyor—you can streamline the process and maintain positive relations with your neighbours throughout the works.

Need Party Wall notices? We offer standard notices FREE OF CHARGE, and transparent, fixed fees for anything else that may arise. ​

Disclaimer: This is Not Professional Advice

The information provided on this website is for general informational purposes only and does not constitute professional advice. While every effort has been made to ensure accuracy, it is not tailored to your specific situation.

Always consult with an experienced professional before taking any action related to the issues discussed. The authors are not liable for any actions taken based on this content, and no professional-client relationship is formed by reading or interpreting this material.


Comments are closed.

    Author

    Write something about yourself. No need to be fancy, just an overview.

    Archives

    June 2025
    May 2025

    Categories

    All

    RSS Feed

Party Walls Made Easy 
Party Wall Experts

HEAD OFFICE ADDRESS: 
Party Walls Made Easy
71-75 Shelton Street
London WC2H 9JQ
TEL: 0207 11 88 070​
EMAIL: [email protected]

​Party Walls Made Easy Copyright © 2024-25